As we are building the brick walls all around the inside of the house, we are installing at the same time the piping for the heat exchange venting system. We decided to place the two main distribution panels, one for all exhaust pipes (hot spoilt air) and one for intake pipes (fresh clean air), in the lower cellar, underneath the house. They will be close to the heat exchange unit and to the arrival of the earth tube system.