The last layer of the roof is being installed: it consists of rafters on top of which poplar planks will be laid. Next will be the clay and finally, the slates. The contractor who will install the slates is not ready until September so the roof will stay like this until then.
Also included in the gallery below are some pics from the grouting work that’s been continuing on all outside walls.